B-07: Voice Log menu item missing (deferred to v1.1 post-M-6) #52

Open
opened 2026-05-12 19:09:17 +00:00 by KofTwentyTwo · 0 comments
KofTwentyTwo commented 2026-05-12 19:09:17 +00:00 (Migrated from github.com)

Summary

Voice Log menu item missing. Plan 10-05 was deferred during Phase 10 re-scope; stash@{0} has partial Voice Log scaffolding from 2026-05-06. Don't ship until B-04/B-05 (#48, #49) land — Voice Log without working voice is misleading. Resurface or rewrite cleanly post-M-6.

Evidence

  • docs/TODO.md:28 — "B-07 — Voice Log menu item missing (Plan 10-05 deferred)"
  • docs/TODO.md:48 — "stash@{0} triage — Voice Log / camera / DevOverlay scaffolding from 2026-05-06"

Recommended fix

DEFERRED to v1.1 per migration plan §10. After #10 (M-6) closes B-04/B-05, either:

  • Resurface stash@{0} content and rewrite against the new Diagnostics surface (#7 M-3)
  • Drop the stash and build cleanly subscribing to voice events through the new Voice surface (#10 M-6)

Source

  • docs/TODO.md:28 (carry-forward bug B-07)
  • .planning/architecture/JARVIS-API-MIGRATION-PLAN.md §10 v1.1 backlog

Cross-references

  • Blocked by: #10 (M-6 voice working) and #7 (M-3 Diagnostics surface)
## Summary Voice Log menu item missing. Plan 10-05 was deferred during Phase 10 re-scope; stash@{0} has partial Voice Log scaffolding from 2026-05-06. Don't ship until B-04/B-05 (#48, #49) land — Voice Log without working voice is misleading. Resurface or rewrite cleanly post-M-6. ## Evidence - `docs/TODO.md:28` — "B-07 — Voice Log menu item missing (Plan 10-05 deferred)" - `docs/TODO.md:48` — "stash@{0} triage — Voice Log / camera / DevOverlay scaffolding from 2026-05-06" ## Recommended fix DEFERRED to v1.1 per migration plan §10. After #10 (M-6) closes B-04/B-05, either: - Resurface stash@{0} content and rewrite against the new Diagnostics surface (#7 M-3) - Drop the stash and build cleanly subscribing to voice events through the new Voice surface (#10 M-6) ## Source - `docs/TODO.md:28` (carry-forward bug B-07) - `.planning/architecture/JARVIS-API-MIGRATION-PLAN.md` §10 v1.1 backlog ## Cross-references - Blocked by: #10 (M-6 voice working) and #7 (M-3 Diagnostics surface)
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: KofTwentyTwo/Jarvis#52