Interim done (commit 5ba6050): the gamed 100%-line gate is replaced with informational coverage (--summary-only). Keeping this open for the remainder: set a realistic fail-under threshold and add the required mock-server E2E gate once Phase 1.C.6 (#161) lands the offline E2E harness.
Interim done (commit 5ba6050): the gamed 100%-line gate is replaced with informational coverage (--summary-only). Keeping this open for the remainder: set a realistic fail-under threshold and add the **required mock-server E2E** gate once Phase 1.C.6 (#161) lands the offline E2E harness.
Superseded by #208 (M7) in the roadmap restructuring (milestones M1–M7). The replacement story carries the full, self-contained spec for a remote implementer. See docs/ROADMAP.md, docs/STORY-WORKFLOW.md, docs/HANDOFF.md.
Superseded by #208 (M7) in the roadmap restructuring (milestones M1–M7). The replacement story carries the full, self-contained spec for a remote implementer. See docs/ROADMAP.md, docs/STORY-WORKFLOW.md, docs/HANDOFF.md.
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Drop the gamed 100%-line gate (excludes main.rs) for a realistic threshold + a required mock-server E2E job. AC: gate reflects real confidence.
Interim done (commit
5ba6050): the gamed 100%-line gate is replaced with informational coverage (--summary-only). Keeping this open for the remainder: set a realistic fail-under threshold and add the required mock-server E2E gate once Phase 1.C.6 (#161) lands the offline E2E harness.Superseded by #208 (M7) in the roadmap restructuring (milestones M1–M7). The replacement story carries the full, self-contained spec for a remote implementer. See docs/ROADMAP.md, docs/STORY-WORKFLOW.md, docs/HANDOFF.md.