ci: move RC coordination into shared orb #51

Merged
KofTwentyTwo merged 1 commits from feature/orb-rc-worker into develop 2026-10-20 23:58:24 +00:00
KofTwentyTwo commented 2026-10-20 23:55:23 +00:00 (Migrated from github.com)

Move the release-candidate caller from the mutable organization workflow to the immutable qqq-orb worker at ee8953b. Pair the canonical callback/finalization caller with orb0.7.3 and the RC completion opt-in in the same default-branch change.

Preserve existing manual and labelled-merge release entry points. The shared worker owns cut intent, publication verification, signed tagging and retry-safe finalization; it does not hold a runner while waiting for CircleCI.

Validation: canonical caller checks and actionlint passed. Hosted Maven checks and a feature-branch dry run are required before merge. Actual signing credential availability and end-to-end RC publication/finalization remain rollout proof requirements. No RC cut is requested by this PR.

Move the release-candidate caller from the mutable organization workflow to the immutable qqq-orb worker at ee8953b. Pair the canonical callback/finalization caller with orb0.7.3 and the RC completion opt-in in the same default-branch change. Preserve existing manual and labelled-merge release entry points. The shared worker owns cut intent, publication verification, signed tagging and retry-safe finalization; it does not hold a runner while waiting for CircleCI. Validation: canonical caller checks and actionlint passed. Hosted Maven checks and a feature-branch dry run are required before merge. Actual signing credential availability and end-to-end RC publication/finalization remain rollout proof requirements. No RC cut is requested by this PR.
Sign in to join this conversation.