Run backup now, restore and verify always run as durable jobs and report
their work through QQQ JobProgress: prepare, tables (N of M, bytes),
media (N of M, copied vs already stored) and upload phases, one log line
per table and artifact (keys relative to the run, never credentials or
row values), warnings and the failure. Restore and verify honour the job
page check for pause and cancel.
Needs QQQ 4.1.0-RC.8 (QRun-IO/qqq#1212).
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
- BackupPlanSyncToScheduledJobProcess (+ verify variant) and the plan table wiring
- BackupRunCoordinator: one run per plan (live-heartbeat lease, QUEUED to RUNNING,
SKIPPED_CONCURRENT warning), maxConcurrentRuns queueing, scheduled entry point
(backupRunScheduledPlan) as the system session with plan-owner validation
- plan save validation (admin and read on resolved tables, object lock vs bucket
capabilities, encryption rules, unsupported formats, planKey immutable after a run)
- PruneCalculator (GFS) and BackupPruner (retention classes, deletePermanent on the
prune alias, kept: locked until, debris, file store mark-and-sweep)
- object lock applied at write time in the engine, parts catalogued as they complete
- Back up these records, Cancel, Resume (PER_TABLE, from the last complete part),
Test destination and Prune processes with Review and Result lines
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com>