Run backup now, restore and verify always run as durable jobs and report
their work through QQQ JobProgress: prepare, tables (N of M, bytes),
media (N of M, copied vs already stored) and upload phases, one log line
per table and artifact (keys relative to the run, never credentials or
row values), warnings and the failure. Restore and verify honour the job
page check for pause and cancel.
Needs QQQ 4.1.0-RC.8 (QRun-IO/qqq#1212).
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>