Phase 3: workspace redesign #27

Merged
KofTwentyTwo merged 1 commits from dev into main 2026-07-04 21:39:14 +00:00
KofTwentyTwo commented 2026-07-04 21:34:12 +00:00 (Migrated from github.com)

The owner-approved redesign from docs/plans/accounts-mode.md Phase 3 + the #16 design comments: connect card → chip + hero table with toolbar/filters/active strip/InfoBar, run-scoped progress, and the #22 P2/P3 reconciliation. Adversarially reviewed pre-ship (4 confirmed findings fixed, incl. a path-recovery/sync mutual-exclusion bug). 174/174 tests, launch verified.

🤖 Generated with Claude Code

The owner-approved redesign from docs/plans/accounts-mode.md Phase 3 + the #16 design comments: connect card → chip + hero table with toolbar/filters/active strip/InfoBar, run-scoped progress, and the #22 P2/P3 reconciliation. Adversarially reviewed pre-ship (4 confirmed findings fixed, incl. a path-recovery/sync mutual-exclusion bug). 174/174 tests, launch verified. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
Sign in to join this conversation.