2025-11-14 - 2026-11-14

Overview

44 Active Pull Requests
0 Active Issues
Excluding merges, 1 author has pushed 8 commits to develop and 74 commits to all branches. On develop, 23 files have changed and there have been 1456 additions and 31 deletions.

11 Releases published by 2 users

Published v0.1.0-RC.11 2026-11-07 18:25:47 +00:00

Published v0.1.0-RC.10 qbit-edi 0.1.0-RC.10 2026-10-16 16:28:20 +00:00

Published v0.1.0-RC.9 qbit-edi 0.1.0-RC.9 2026-10-15 22:12:26 +00:00

Published v0.1.0-RC.8 qbit-edi 0.1.0-RC.8 2026-10-15 21:14:52 +00:00

Published v0.1.0-RC.7 qbit-edi 0.1.0-RC.7 2026-10-15 02:53:47 +00:00

Published v0.1.0-RC.6 qbit-edi 0.1.0-RC.6 2026-10-14 23:12:50 +00:00

Published v0.1.0-RC.5 qbit-edi 0.1.0-RC.5 2026-10-14 20:33:36 +00:00

Published v0.1.0-RC.4 qbit-edi 0.1.0-RC.4 2026-10-14 16:45:06 +00:00

Published v0.1.0-RC.3 qbit-edi 0.1.0-RC.3 2026-10-14 14:32:08 +00:00

Published v0.1.0-RC.2 qbit-edi 0.1.0-RC.2 2026-10-14 13:54:16 +00:00

Published v0.1.0-RC.1 qbit-edi 0.1.0-RC.1 2026-10-14 12:32:51 +00:00

40 Pull requests merged by 2 users

Merged #48 Merge develop into release/0.1 (Gitea-aligned RC) 2026-11-07 18:11:17 +00:00

Merged #47 build(deps): align with Gitea registry (parent 2.2.1, QQQ 4.1.0-RC.26) 2026-11-07 18:05:27 +00:00

Merged #46 ci: pin shared workflow to v1 2026-11-06 16:07:00 +00:00

Merged #45 ci: use shared ci-workflows Maven workflow 2026-11-05 23:16:34 +00:00

Merged #43 ci: add the QRun release caller 2026-11-02 22:16:10 +00:00

Merged #44 ci: enroll shared Gitea release-candidate lifecycle 2026-11-02 21:33:20 +00:00

Merged #42 ci: add the QRun release caller 2026-11-02 18:44:13 +00:00

Merged #38 ci: enroll in the shared QQQ orb 2026-10-22 00:51:59 +00:00

Merged #37 ci: adopt managed orb 0.8 patch track 2026-10-21 20:33:39 +00:00

Merged #36 ci: adopt shared orb 0.7.18 2026-10-21 19:48:41 +00:00

Merged #35 ci: adopt shared orb 0.7.17 2026-10-21 19:25:30 +00:00

Merged #34 ci: centralize release branch verification and workflows 2026-10-21 18:37:34 +00:00

Merged #33 ci: centralize QBit source scanning 2026-10-21 15:35:05 +00:00

Merged #32 ci: use the shared orb pipeline on main 2026-10-21 15:20:39 +00:00

Merged #31 ci: adopt central orb 0.7.12 and stable gates 2026-10-21 13:58:19 +00:00

Merged #30 ci: centralize RC release completion in qqq orb 2026-10-21 07:30:33 +00:00

Merged #29 ci: adopt shared orb 0.7.11 2026-10-21 06:01:51 +00:00

Merged #27 ci: adopt verified central QQQ orb 0.7.1 2026-10-20 23:53:03 +00:00

Merged #26 fix(app): business-only EDI home; system widgets for the Admin home 2026-10-16 15:19:39 +00:00

Merged #25 ci(release-rc): pass secrets so the shared workflow can sign the RC tag 2026-10-16 13:05:13 +00:00

Merged #24 feat(ui-api): extension for QQQ UI API 1.6.0 (operationIds, BasicErrorResponseV1, QQQ 4.1.0-RC.15) 2026-10-15 21:13:05 +00:00

Merged #23 fix(outbound): record-change listener only costs queries for configured source tables 2026-10-15 12:38:22 +00:00

Merged #22 fix: qbit metadata version comes from the build 2026-10-15 06:42:57 +00:00

Merged #21 test(help): bundle version test compares with the artifact version 2026-10-15 04:18:43 +00:00

Merged #20 fix(help): help bundle version comes from the build, not a hardcoded SNAPSHOT 2026-10-15 03:37:21 +00:00

Merged #19 feat(help): qbit-edi help bundle via QQQ help bundles, with coverage gate 2026-10-15 01:45:31 +00:00

Merged #18 feat: every edi table explains itself; Setup status; Install sample maps 2026-10-14 22:42:45 +00:00

Merged #17 fix: no cron time zone on repeat-seconds worker schedules 2026-10-14 20:10:03 +00:00

Merged #16 ci: qqq-orb 0.6.9 (refresh SNAPSHOT dependencies) 2026-10-14 15:57:02 +00:00

Merged #15 feat: phase f1 - spec'd UI API extension for the EDI mapper and sandbox 2026-10-14 14:58:49 +00:00

Merged #14 build: move to QQQ 4.1.0-RC.6 and remove RC.5 stand-ins 2026-10-14 14:26:58 +00:00

Merged #13 feat: phase g - EDIFACT 2026-10-14 13:59:27 +00:00

Merged #11 feat: phase e - HIPAA healthcare documents, SNIP 3-5, PHI handling, canary tests 2026-10-14 13:46:36 +00:00

Merged #10 feat: phase c - AS2 transport 2026-10-14 13:27:25 +00:00

Merged #9 feat: phase d - logistics documents 940, 945, 214, 204 2026-10-14 12:47:13 +00:00

Merged #7 feat: phase b - retail documents, outbound pipeline, transports, ack monitor, demo 2026-10-14 12:09:36 +00:00

Merged #6 feat: phase a2 - inbound vertical slice (inbox, routing, maps, apply, gateway intake, app home) 2026-10-14 12:09:22 +00:00

Merged #5 feat: phase a1 - EDI data model, X12 parsing, guide validation, TA1/997/999 2026-10-14 12:09:09 +00:00

Merged #4 docs: qbit-edi design spec 2026-10-14 00:43:50 +00:00

Merged #1 chore: bring the scaffold up to the QRun qbit repository standard 2026-10-14 00:34:42 +00:00

4 Pull requests proposed by 1 user

Proposed #28 build(deps): Bump the maven-minor-and-patch group across 1 directory with 6 updates 2026-10-21 00:34:37 +00:00

Proposed #39 build(deps): Bump the github-actions group with 2 updates 2026-10-28 00:34:59 +00:00

Proposed #40 Qualify central Gitea Java CI 2026-10-31 12:41:31 +00:00

Proposed #41 ci: baseline two historical AS2 test-key fingerprints 2026-11-01 21:03:32 +00:00